Construction delays on 89

The Wyoming Department of Transportation began milling and paving operations on the old pavement south of the bridge over the Snake River on US 26/89/189/191 yesterday, as well as on the old pavement near the retaining wall construction south of the wildlife bridge.  Traffic is being diverted onto crushed base in a single lane in each direction during operations.   Speeds will be reduced and delays should be expected.

Jackson Hole Radio